If You Invest ₹100 in a Data Centre, Where Does It Go?

In a modern AI data centre, most of the money goes not into the building but into the computers inside it, which also wear out fastest.

The Physical World Behind AI, the Tech Innovations library

First published 30 October 2026 Last reviewed 29 October 2026 Explained Simply

People often picture a data centre as a building. For an AI data centre, the building is the smaller part of the bill. One published model of a large AI data centre puts more than half of the up-front cost into the servers, about a third into the facility that houses, powers and cools them, and most of the rest into the network. Land is a very small share. And the servers, the biggest item, are also the part that has to be replaced first.

One model, split into ₹100

Epoch AI, an independent research group, modelled a one-gigawatt AI data centre owned and run by a large US cloud company. It estimates about US$38 billion of up-front cost. Shown as shares of every ₹100, the split is:

PartUp-front cost in the model (US$ million)Of every ₹100 (calculated)
Servers21,188about ₹56
Facility: building, power and cooling11,433about ₹30
Network4,925about ₹13
Land172less than ₹1
Utility works164less than ₹1

The model assumes NVIDIA GB200 NVL72 servers and US costs, so the split will differ elsewhere, but the pattern holds widely: the computers dominate.

Spent once, or spent again and again

The facility in Epoch AI's model is assumed to last 14 years and the IT equipment 5 years. So the server share of the money is not spent once; it recurs as servers are replaced. Epoch AI notes that shortening the IT lifespan to 3 years raises the total annual cost of its model data centre to US$12 billion, while extending it to 7 years lowers it to US$7 billion.

Why published figures differ

Many cost figures cover only part of the bill. Turner & Townsend's widely quoted cost per watt, for example, covers the shell and core and the mechanical and electrical fit-out, and excludes land, utility works and active IT equipment. A figure that leaves out the servers describes the smaller part of an AI data centre's cost.

What is not certain

  • The split comes from one model of a very large US facility; a smaller site, or a site leasing space to others who bring their own servers, divides its money very differently.
  • Server prices and lifetimes are changing quickly.

Sources and method

Method: each link was opened on 29 October 2026 and every figure was taken from the page or filing cited beside it, in the currency stated there; shares marked as calculated are simple arithmetic on the cited figures. Company and consultancy figures describe their own data and models; they are not recommendations.