Transformers and switchgear on an assembly hall floor

Partner track 9 of 9

Suppliers, manufacturers and services

A 100 MW campus is built from transformers, chillers, cable, steel, software and the people who install and maintain them. Register now; procurement begins at the design stage and runs by competitive process.

The opportunity

A 100 MW campus is built from transformers, chillers, cable, steel, software and the people who install and maintain them. Procurement begins at the design stage and runs by competitive process.

What we expect

Manufacturers, contractors and service providers, many from Tamil Nadu, registering now so they are known before the first request for proposal is issued. Register interest; not a tender.

What to send

One comparable supply or project, in a sentence: what, where, when, scale. The full record is asked for when procurement in your area begins.

Why this track matters to the project

The eight consortium tracks bring the partners who lead, finance, design and operate the campus. Beneath them sits a supply chain of manufacturers, contractors and service providers, much of it available in Tamil Nadu and the rest of India. The project's contractors and, later, the project company will procure from that supply chain by competitive process, starting when the design-build contractor is appointed and continuing through construction, commissioning and operations. Tech Innovations keeps this register so that capable suppliers are known before the first request for proposal is issued.

Equipment, construction and installation for a data centre campus

Disciplines in this track

Every area in this track carries the label Register interest for a later phase: a registration now is welcome, is held, and is shared with the project's contractors and the project company when procurement in that area begins.

IT and computing hardware

Racks, servers, storage and high-performance computing equipment, largely specified by tenants and their vendors.

Register interest for a later phase

Networking and cabling

Switches, routers, optical fibre, structured cabling, transceivers.

Register interest for a later phase

Electrical and power equipment

HT and LT panels, transformers, switchgear, bus ducts, UPS, power distribution units, generator sets, energy storage, cables, power management.

Register interest for a later phase

Cooling and thermal equipment

Chillers, liquid-cooling systems, plate heat exchangers, pumps, cooling distribution units, piping, corrosion-resistant seawater equipment.

Register interest for a later phase

Fire, safety, security and building management

Fire detection and suppression, surveillance, access control, perimeter security, integrated building management.

Register interest for a later phase

Civil, structural and prefabricated construction

Civil works, structural steel, prefabricated buildings, specialised flooring, HVAC, insulation, industrial fabrication.

Register interest for a later phase

Renewable integration, water and environment

Solar and wind integration, energy management, water treatment, corrosion-resistant materials, environmental monitoring.

Register interest for a later phase

Automation and operations software

Sensors, smart meters, SCADA, industrial controls, AI-based monitoring, predictive maintenance, facility management software.

Register interest for a later phase

Logistics, installation, commissioning and maintenance

Transport, warehousing, equipment installation, testing and commissioning, maintenance contracts.

Register interest for a later phase

Technical training and skills

Training providers and institutions for the trades and technical roles the campus will employ.

Register interest for a later phase

Other supporting services

Services not listed above that a campus of this kind needs.

Register interest for a later phase

What we ask you to show

At registration, one comparable supply or project in a sentence is enough: what you supplied or built, where, when and at what scale. When procurement in your area begins, the contractor or the project company will ask for the full record:

Manufacturers and suppliers
product range and standards compliance, manufacturing location and capacity, reference installations in data centres or comparable industrial facilities, service and spares arrangements in Tamil Nadu.
Contractors and installers
comparable works with value and duration, safety record, workforce and equipment, certifications.
Service and training providers
comparable engagements, accreditation, capacity in the region.
High voltage switchgear and electrical plant

What happens next

Registrations are held by Tech Innovations and shared with the project's design-build contractor and the project company as each area reaches procurement. Procurement is by competitive process, recorded, and run by the party that holds the contract, not by this website. Registering does not shorten or replace that process; it ensures your organisation is on the list when it starts.

How partnership works

Make a capability submission

Comparable work first. Screening by people. Nothing committed on either side until the document that records it says so.

A registration is not a tender, a request for quotation, a prequalification or an order, and creates no entitlement to selection or contract award. No supply, construction or service arrangement is claimed. Organisations must disclose conflicts of interest and must not offer any gift, payment or benefit to influence a selection. Procurement decisions rest with the contracting party at the time.