Economics

Where Should the Next Data Centre Be Built?

Power now decides more than anything else, but land, water, fibre, customers, climate and government policy all have to line up in the same place.

The Physical World Behind AI, the Tech Innovations library

First published 30 October 2026 Last reviewed 29 October 2026 The Bigger Picture

A data centre needs a lot of reliable power, fast network connections, land, a way to remove heat, and permission to build. For years, closeness to customers and fibre decided location. Now, with AI, access to power and the time it takes to connect often decide first. The best site is where enough of these line up at once, at an acceptable cost and on an acceptable timeline.

What the evidence lists

Lawrence Berkeley National Laboratory's 2024 report on US data centres notes that factors such as proximity to population centers, electricity cost, network infrastructures, and local utility prices influence where data centres locate, and that Virginia hosts the highest electricity demand associated with data centres in the United States. The International Energy Agency observes that the rising demand of data centres, combined with their regional concentration, is leading to long grid connection queues in many regions, and that training AI can be done far from users while answering users may benefit from being close to them.

FactorWhy it matters
Power and connection timeNo power, no data centre; connection queues set the timetable
NetworkFibre routes and subsea cables carry the data in and out
Closeness to usersMatters for answering users quickly; less for training models
ClimateCooler climates make cooling cheaper
WaterSome cooling designs need it; scarcity limits options
Land and permitsSpace for halls and substations, and how long approvals take
Policy and incentivesTax, land and power rules change the cost

Policy in India

India's Ministry of Electronics and Information Technology published a draft data centre policy for discussion in November 2020. It lists challenges including high cost of power, complex clearance processes and time consuming approvals, and proposes that states be encouraged to demarcate zones for data centre parks and that open access allow data centre providers to buy power directly. Several states have their own policies; Tamil Nadu's Data Centre Policy 2021, for example, notes that the state has the second highest number of submarine cable landing stations in India and applied to data centre units and parks incorporated until 31 March 2026. Anyone considering a site should check which policies are in force at the time.

What is not certain

  • The weight of each factor differs by type of data centre; AI training sites and sites serving users choose differently.
  • Policies and incentives change; the examples here are as published on their dates and may have been revised or have expired.

Sources and method

Method: each link was opened on 29 October 2026 and every figure was taken from the page or filing cited beside it, in the currency stated there. No figure was estimated. Company examples describe what those companies report about themselves; they are not recommendations.