Operations specialists inspecting closed data-centre racks.

Anchor tenants and large compute buyers

One or two anchor tenants make the campus financeable.

What the project needs

The project is looking for the commitment that makes a 100 MW coastal campus financeable: a hyperscaler, an AI cloud, a frontier model developer or a large enterprise taking capacity, with the density, power and timing it is able to disclose.

Conversations with anchor tenants run alongside the first stage, and wider tenant conversations follow as the design advances.

Who it suits

Organisations such as:

  • Hyperscalers and public cloud providers
  • AI clouds and frontier model developers
  • Sovereign and government cloud programmes
  • Large enterprises and IT services companies

How it connects to the campus

Data-centre developers and operators runs the campus you would take capacity in.
AI cloud and GPU providers is a natural tenant.
Fibre and subsea cable provides two separate routes.
Liquid cooling cools 120 to 140 kW racks.

What to show

At registration, tell us the capacity, density and timing you are able to disclose.

Current contracted capacity and future requirements, power profile and target commissioning window, reliability and latency requirements, and the deployment precedents you are permitted to disclose.

How to take part

  1. Register your interest

    Tell us about your organisation and your area of interest.

  2. A conversation

    We will arrange a confidential discussion to explore fit and opportunities.

  3. The data room

    Selected organisations will be invited to a data room with further information.

Selected organisations receive, through the data room, the design concept, the power and cooling assumptions, the connectivity brief and the tenant requirements for their role.