A high voltage substation at dawn

Renewable integration, water and environment

A coastal AI campus that runs on contracted renewable power, and avoids potable water for primary cooling, needs the systems that make both work on site.

What the project needs

The opportunity covers solar and wind integration, energy management, water treatment, corrosion-resistant materials and environmental monitoring: the systems around the electrical chain that keep a coastal campus clean, efficient and well measured.

Setupuram is designed to avoid using potable water for primary cooling, and the sea air of a coastal site asks more of every material and coating than an inland one.

Who it suits

Manufacturers, suppliers and contractors of:

  • Solar EPC and on-site solar
  • Wind turbines and inverters
  • Energy management systems
  • Water treatment: STP, ETP and RO plants
  • Corrosion protection, coatings and cathodic protection
  • Environmental monitoring, weather stations and air quality

How it connects to the campus

Power: utilities, renewable producers, transmission and storage contracts the renewable supply this equipment integrates.
Seawater and marine heat-exchange engineering shares the coastal conditions and corrosion demands.
Environmental and coastal consultants sets the monitoring the campus reports against.
Automation and operations software reads the meters and sensors.

What to show

At registration, one comparable supply or project in a sentence is enough: what you supplied or built, where, when and at what scale.

When procurement in this area begins: your product range and standards compliance, manufacturing location and capacity, reference installations in data centres or comparable industrial facilities, and service and spares arrangements in Tamil Nadu.

How to take part

  1. Register your interest

    Tell us about your organisation and your area of interest.

  2. A conversation

    We will arrange a confidential discussion to explore fit and opportunities.

  3. The data room

    Selected organisations will be invited to a data room with further information.

Selected organisations receive, through the data room, the load and reliability assumptions and the grid-study request for information.

Manufacturers, contractors and service providers who register now are known to the project's contractors and the project company when procurement in their area begins. Procurement is a recorded competitive process, run by the party that holds the contract.